{"id":27174,"date":"2022-01-12T14:10:45","date_gmt":"2022-01-12T13:10:45","guid":{"rendered":"https:\/\/www.eh.at\/?p=27174"},"modified":"2023-11-02T13:40:42","modified_gmt":"2023-11-02T12:40:42","slug":"eh-advises-wien-energie-on-expanding-wind-power-in-styria","status":"publish","type":"post","link":"https:\/\/www.eh.at\/en\/eh-advises-wien-energie-on-expanding-wind-power-in-styria\/","title":{"rendered":"E+H advises Wien Energie on expanding wind power in Styria"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"27174\" class=\"elementor elementor-27174 elementor-27171\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-7d1bfcc6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7d1bfcc6\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-55958c5a\" data-id=\"55958c5a\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-2d691acc elementor-widget elementor-widget-text-editor\" data-id=\"2d691acc\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<!-- wp:tadv\/classic-paragraph -->\n<p style=\"text-align: justify;\">E+H advised Wien Energie on the acquisition of the remaining 51% of the shares in the Austrian wind farms Pongratzer Kogel, Herrenstein, and Zagersdorf from the wind and solar farm operator Encavis AG. Wien Energie had acquired a 49% stake in the project companies in December 2020 and was also represented by E+H at that time.<\/p>\n<p style=\"text-align: justify;\">The three wind farms generate a total of 36.2 megawatts. They also reduce the CO2 emissions of the company&#8217;s own energy generation by around 14,500 tons per year. The complete takeover means that Wien Energie can now increase its total portfolio by a further calculated 18 megawatts.<\/p>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/www.eh.at\/en\/profile\/marco-steiner\/\">Marco Steiner<\/a> and <a href=\"https:\/\/www.eh.at\/en\/profile\/christoph-lejsek\/\">Christoph Lejsek<\/a> led the E+H team on this dynamic energy project.<\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\"><strong>Advisors to Wien Energie:<br \/><\/strong><strong>E+H Eisenberger + Herzog Rechtsanwalts GmbH<br \/><\/strong>Marco Steiner (Partner, Corporate\/M&amp;A), <a href=\"https:\/\/www.eh.at\/en\/profile\/dieter-thalhammer\/\">Dieter Thalhammer<\/a> (Partner, Antitrust Law), Christoph Lejsek (Attorney, Corporate\/M&amp;A), Daniel Metz (Associate, Antitrust Law), Fabian Larcher (Associate, Corporate\/M&amp;A), <a href=\"https:\/\/www.eh.at\/en\/profile\/matthias-pallisch\/\">Matthias Pallisch<\/a> (Associate, Corporate\/M&amp;A)<\/p>\n<p style=\"text-align: justify;\">\u00a0<\/p>\n<p style=\"text-align: justify;\"><strong>Advisors to Encavis:<br \/><\/strong><strong>Taylor Wessing<br \/><\/strong>Philipp Hoflehner, MIM (CEMS) (Partner, M&amp;A), Peter Solt, LL.M. (Partner, Real Estate)<\/p>\n<!-- \/wp:tadv\/classic-paragraph -->\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"rank_math_lock_modified_date":false,"inline_featured_image":false,"footnotes":""},"categories":[234],"tags":[],"group":[],"area":[],"location":[],"systype":[],"class_list":["post-27174","post","type-post","status-publish","format-standard","hentry","category-press"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/posts\/27174"}],"collection":[{"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/comments?post=27174"}],"version-history":[{"count":5,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/posts\/27174\/revisions"}],"predecessor-version":[{"id":39144,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/posts\/27174\/revisions\/39144"}],"wp:attachment":[{"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/media?parent=27174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/categories?post=27174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/tags?post=27174"},{"taxonomy":"group","embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/group?post=27174"},{"taxonomy":"area","embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/area?post=27174"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/location?post=27174"},{"taxonomy":"systype","embeddable":true,"href":"https:\/\/www.eh.at\/en\/wp-json\/wp\/v2\/systype?post=27174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}